# Energy Price & Availability

What a unit of electricity costs where the work happens, and whether a new factory, data centre or solar farm can be connected to the grid at all. Cheap power you cannot plug into is not cheap. In the US, power plants and batteries totalling about 2,000 gigawatts are waiting in line for a grid connection, and of projects that applied over two decades only about one in eight was ever built. The panels were cheap; the queue was not.

> What a unit of electricity costs where the work happens, and whether a new plant or a new factory can be connected to the grid at all.

## Maturity
3/5 — Generation is mature and cheap. Getting new capacity connected is not: US queues held 2,061 GW at the end of 2025, and only 13% of the capacity that applied in 2000–2020 was ever built. Europe's non-household prices eased in 2025, but the dearest country still pays more than three times what the cheapest does.

Capability 4 · deployment 3 · absorption 3 · bound by regulation · flat

Source: LBNL, Queued Up: 2026 Edition (May 2026); Eurostat, electricity price statistics (Apr–May 2026); EIA, Electric Power Annual 2024 (Oct 2025); IEA Energy and AI (E-009, E-010) for the data-centre figures in the print text (2024–2026)

## What it is
What a unit of energy costs where the work has to happen, and whether it can be connected at all. Price and grid access are one enabler in practice: cheap power you cannot connect to is not cheap power.

## What it does
It sets the gradient on everything physical, and increasingly on everything computational. It is also the enabler where the constraint has quietly moved: for large loads the binding factor in several markets is no longer generation cost but interconnection queue length. That distinction matters because the two have completely different fixes and only one of them is a technology.

## Common misconception
That data centres are the driver of demand growth. They are large and they are not civilisational: roughly 1.5% of global electricity in 2024. Electrification is the bigger driver, and saying so is not a defence of data centres. It is what the numbers show.

## Steepens
- Automation of Cognitive Work (automation-of-cognitive-work) — moderate
- Distributed and Reshored Manufacturing (distributed-and-reshored-manufacturing) — large
- Energy Transition and Electrification (energy-transition-and-electrification) — large
- Digital Sovereignty (digital-sovereignty) — large
- Water Security (water-security) — moderate
- Circular Economy and Materials Substitution (circular-economy-and-materials-substitution) — moderate
- Hyper-automation of Industrial Production (hyper-automation-of-industrial-production) — moderate

## What would change its gradient
- Interconnection queue reform - the single highest-leverage and least photogenic intervention available
- Storage and demand flexibility that let a load follow generation rather than requiring firm capacity
- Efficiency at the point of use, which has repeatedly resolved bottlenecks that were forecast as permanent