Nuclear & SMR

Nuclear power splits heavy atoms to make heat, which turns water into steam to drive turbines, day and night without burning fuel. Over 400 reactors run worldwide and supply about a twelfth of the world's electricity. Small modular reactors are a newer idea: smaller units built in factories. Only two are running, in Russia and China, and a flagship US project was cancelled because its planned power price rose from $58 to $89 per megawatt-hour.

Maturity

3/ 5
measured
BasisConventional fission is mature: 417 reactors ran at the end of 2024 and the US fleet runs above 90% of the time. SMRs are barely deployed - two plants, in Russia and China - and the flagship Western project was cancelled on price. The 3 is the blend; SMRs alone would score 1–2.SourceIAEA power-reactor statistics via World Nuclear News (Sep 2025); IAEA, Small Modular Reactors: Advances in SMR Developments 2024; EIA, Monthly Energy Review (Aug 2026); NuScale (8 Nov 2023); EIA (May 2024)Vintage2020–2026
ReadinessCapability 4Deployment 3Absorption 3Bound bycapitalTrendflat

Where it feeds in

4 megatrends in 2 forcesweakest link

Where you have already met this

NuScale's first plant was to be six 77-megawatt modules in Idaho. In January 2023 the target price of its power rose from $58 to $89 a megawatt-hour, and the cost estimate went from $5.3 billion to $9.3 billion. By November not enough utilities had signed up to buy the power, and the project was cancelled. Nobody cancelled it over safety. They cancelled it over the price.

If this moved

If serial factory production brought SMR costs down, the SMR half of this entry would catch up with the fission half. The energy transition would still sit at 1, held by consumption norms. Nuclear proliferation is the one megatrend this entry holds on its own, so a higher score here is the only thing on this list that could lift it.

What to watch for

Construction cost and duration published for a second and third identical SMR - the only evidence that factory learning is real. Commercial supplies of HALEU fuel from outside Russia.

Not to be confused with

Fusion. Fission splits heavy atoms and has powered grids for decades; fusion joins light ones and has not yet put electricity on any commercial grid.

What it is

Fission power, including the small modular reactor designs intended to reduce construction cost and time through factory production.

How it works

  1. 01Split the atomUranium nuclei absorb neutrons and split, releasing heat and more neutrons that keep the chain reaction going.
  2. 02Control the chainA moderator slows the neutrons so they split more atoms; control rods absorb them to hold the reaction steady.
  3. 03Carry the heat awayWater, gas or molten salt flows through the core and takes the heat out.
  4. 04Make steam, turn a turbineThe heat boils water; the steam spins a turbine and a generator, as in any thermal plant.
  5. 05Shrink it and build it in a factorySMR designs make each unit small enough to build in a factory and ship, and many rely on passive cooling that needs no pumps after shutdown. The cost case depends on building many identical ones.

State of play

  • At the end of 2024, 417 nuclear power reactors were operating with 377 GW of capacity, 62 more (64.4 GW) were under construction, and nuclear supplied 8.7% of the world's electricity (IAEA figures via World Nuclear News, Sep 2025).
  • The US nuclear fleet ran at a capacity factor of 92.7% in 2023, 90.8% in 2024 and 91.0% in 2025 (EIA, Monthly Energy Review, Aug 2026).
  • Russia's floating plant Akademik Lomonosov, with two KLT-40S reactors, entered commercial operation at Pevek on 22 May 2020 (NucNet, May 2020).
  • China's HTR-PM at Shidao Bay - two small gas-cooled reactors driving one 210 MWe turbine - entered commercial operation in December 2023, two years after grid connection (World Nuclear News, 6 Dec 2023).
  • NuScale and UAMPS terminated the 462 MW Carbon Free Power Project because too few utilities had subscribed; its cost estimate had risen from $5.3bn to $9.3bn (NuScale, 8 Nov 2023; Utility Dive, Nov 2023).
  • Vogtle Units 3 and 4 in Georgia entered service in 2023 and 2024; the project's original estimate was $14bn and its final cost more than $30bn (EIA, May 2024).

Why it matters

It provides firm low-carbon generation, which is the property variable renewables lack. Whether that property is needed at scale is one of the contested debates this book presents without a verdict.

  • It is the only enabler holding nuclear proliferation at 3. Whatever this score does, that megatrend follows.
  • It feeds the energy transition heavily, and the energy transition does not wait on it: consumption norms hold that at 1.
  • It is the map's cleanest split entry. The fission half is a 4; the SMR half is a 1–2. The blended 3 is honest only if both halves are read.

What holds it back

Capital cost and financing

Reactors are paid for years before they earn anything, so interest rates and overruns decide the price of their power. Vogtle more than doubled; NuScale's estimate rose 75%.

Serial production

The SMR cost case assumes many identical units. No Western design has built a second one yet.

Licensing and fuel

Licensing regimes were written for large bespoke plants, and several advanced designs need HALEU fuel that has mostly come from Russia.

Public acceptance and waste

Both are human and institutional constraints, and neither is solved by engineering alone.

Terms

Small modular reactor (SMR)
A reactor of up to about 300 MWe designed to be built from factory-made modules.
Capacity factor
The share of the time a plant produces at full output over a year.
HALEU
High-assay low-enriched uranium: fuel enriched to between 5% and 20% uranium-235, needed by several advanced designs.
Levelised cost of electricity (LCOE)
A plant's lifetime costs divided by its lifetime output - the price per megawatt-hour it needs to break even.
Passive safety
Cooling that works through gravity and natural circulation, without pumps or operators.

Steepens

MegatrendWeightRole
Energy Transition and Electrificationlarge
Digital Sovereigntymarginalmarginal: not counted as a weakest link
Critical Mineral and Resource Scarcitymoderate
Nuclear Proliferation and the Erosion of Arms Controlmoderateweakest link

The gradient behaves like a sticky rubber band: it is pulled hardest toward the weakest enabler. Marginal links are shown but do not pull.

If this moved one step

Computed from the map as it stands: this score raised from 3 to 4, every other score unchanged. It is arithmetic, not a forecast.

Lifts the weakest link in

The gradient also rises in

What if it moved?

What would change the gradient

Conditional, not predictive. No dates, no probabilities.

  1. 01Serial factory production actually happening - the whole cost case
  2. 02Licensing regimes designed for large bespoke plants
  3. 03Waste and public acceptance, which are human and institutional enablers

Common misconception

That SMRs have demonstrated the economics they promise. Very few are operating; the cost advantage depends on serial factory production that has not yet been demonstrated at volume.