Renewables & Storage
Electricity from sun, wind, rivers and the heat underground, plus the batteries that keep it flowing when the weather does not cooperate. New solar and wind are now the cheapest power to build in most of the world, and almost 700 gigawatts were added in one year. The new problem is using it all: in a single month, California's grid threw away enough wind and solar power to run a city, because the wires could not take it.
Maturity
Where it feeds in
Where you have already met this
In March 2025, California's grid operator discarded 919,020 megawatt-hours of wind and solar power. One month. In 2024, 93% of everything it discarded was solar - the cheapest new electricity there is. Nothing was wrong with the panels. The problem was where the power had to go.
If this moved
If connection and flexibility caught up with generation, this entry would be a 5 again - and nothing on the map would move. Energy transition and climate resilience are held at 1 by consumption norms, and the grid entry, at 3, is the next weak link. Cheap generation was necessary. It has not been sufficient.
What to watch for
Annual curtailment at high-solar grid operators such as California's - rising means generation is outrunning the grid. The median time from connection request to operation in Berkeley Lab's yearly queue report.
Not to be confused with
Smart grid and transmission. This entry makes and stores the power; that one moves it. The first has matured. The second is where the queue is.
What it is
Generation from wind, solar, hydro and geothermal, together with the storage that makes variable output usable.
How it works
- 01Panels and turbines convertSolar cells turn light into direct current; wind turbines turn moving air into electricity. Neither can be turned up on demand.
- 02Inverters match the gridPower electronics convert the output to alternating current at the grid's frequency, and increasingly help hold that frequency steady.
- 03The project queues for a connectionBefore a new plant can export, the grid operator studies its effect and agrees a connection. In the US that step now takes longer than building the plant.
- 04Batteries shift the timingWhen supply exceeds demand, batteries charge; when the sun sets, they discharge. Most new systems store about two hours' worth.
- 05What cannot be absorbed is curtailedIf neither demand, storage nor the wires can take the power, the operator orders it switched off.
State of play
- The world added 692 GW of renewable capacity in 2025 - 511 GW solar and 159 GW wind - for a total of 5,149 GW (IRENA, Renewable Capacity Statistics 2026).
- Renewables were 85.6% of all new power capacity in 2025, down from 92.0% in 2024 (IRENA, Renewable Capacity Statistics 2026).
- Electricity from new utility-scale solar cost $0.043/kWh on global average in 2024, and from onshore wind $0.034/kWh; 91% of new utility-scale renewable capacity undercut the cheapest new fossil option (IRENA, Renewable Power Generation Costs in 2024, Jul 2025).
- 108 GW of battery storage was added worldwide in 2025, 40% more than in 2024; most installations are built for around two hours (IEA, Global Energy Review 2026).
- California's grid operator curtailed 3.4 million MWh of wind and solar in 2024, 29% more than in 2023; 93% of it was solar (EIA, Today in Energy, 28 May 2025).
- About 2,060 GW of US generation and storage was waiting to connect at the end of 2025; projects that came online in 2025 took over five years from request to operation (Berkeley Lab, Queued Up: 2026 Edition).
Why it matters
It is the most successful cost-decline story in this book, and the reason the energy transition is now an integration problem rather than a generation problem.
- It feeds energy transition and electrification heavily, and that megatrend sits at 1 - held by consumption norms, not by generation. Cheaper panels do not move it.
- It is the map's cleanest case of a constraint moving. Generation matured; connection did not, and the queue now sets the pace.
- It also feeds climate resilience, reshoring and critical minerals. Each is held lower by something else.
What holds it back
Grid connection
New plants wait years for a connection study and agreement. The wait is procedural, not technical.
Flexibility
Output follows the weather. Without storage, demand response or transmission, surplus power is thrown away.
Storage duration
Most batteries being built cover a couple of hours, not a windless week.
Terms
- Levelised cost of electricity (LCOE)
- The lifetime cost of building and running a plant divided by the electricity it produces.
- Curtailment
- Deliberately switching off generation that could have run, because the grid cannot take it.
- Interconnection queue
- The list of projects waiting for a grid study and a connection agreement.
- Round-trip efficiency
- The share of the electricity put into a battery that comes back out.
- Duck curve
- The daily shape of demand once solar is subtracted: a midday dip, then a steep evening climb.
Steepens
| Megatrend | Weight | Role |
|---|---|---|
| Energy Transition and Electrification | large | |
| Climate Resilience Imperative | moderate | |
| Distributed and Reshored Manufacturing | moderate | |
| Critical Mineral and Resource Scarcity | moderate |
The gradient behaves like a sticky rubber band: it is pulled hardest toward the weakest enabler. Marginal links are shown but do not pull.
If this moved one step
Computed from the map as it stands: this score raised from 4 to 5, every other score unchanged. It is arithmetic, not a forecast.
Raised one step on its own, it lifts no megatrend's weakest link; each gradient it feeds still rises a little.
The gradient also rises in
- Climate Resilience Imperative2.3/5 , 2.3/5
- Critical Mineral and Resource Scarcity2.7/5 , 2.7/5
- Distributed and Reshored Manufacturing2.6/5 , 2.6/5
- Energy Transition and Electrification2.3/5 , 2.3/5
What would change the gradient
Conditional, not predictive. No dates, no probabilities.
- 01Interconnection queue reform - the single highest-leverage intervention available
- 02Transmission build rates, which are permitting-bound not cost-bound
- 03Flexibility and demand response, which reduce the need for both
Common misconception
That falling generation cost means the transition is on track. Generation is the enabler that matured; grid connection, transmission and flexibility did not, and the constraint moved there.
Talin, B. (2026). Renewables & Storage. The Future Explorer, dataset v0.4.0 (2026-11-16). https://explorer.talin.digital/e/renewables-and-storage/